Print

Rain changes GDOT plans for Browns Bridge lane shift

By AccessWDUN Staff
Posted 10:08AM on Monday 2nd November 2015 ( 8 years ago )

GAINESVILLE — State transportation officials announced Monday morning that the rainy weather has stalled plans to shift lanes on Highway 369/Browns Bridge Road west of Gainesville. 

GDOT said in a press statement the work is now scheduled for November 10.

The lanes of the roadway were shifted months ago as the developers of Cresswind community built a tunnel underneath SR 369 to connect sections of the community on either side of the road.

On November 10, traffic will be shifted back to the original location of SR 369.

 

 

http://accesswdun.com/article/2015/11/346832/rain-changes-gdot-plans-for-browns-bridge-lane-shift

© Copyright 2015 AccessNorthGa.com All rights reserved. This material may not be published, broadcast, rewritten, or redistributed without permission.