Print

GDOT: New contract 'bundle' concept being used on several northeast Ga. bridge projects

By AccessWDUN staff
Posted 3:00PM on Sunday 31st July 2016 ( 8 years ago )

When the Georgia Department of Transportation awarded statewide construction contracts earlier this month, a new method was used on several contracts to accelerate the replacement of twenty-five local bridges throughout the state.

The method, known as "bridge bundles," used five design-build contracts that each group four to six bridge replacements geographically, which allows the contractor to streamline delivery by combining design and construction activities for the bridges in their bundled contract. This concept is especially suitable in rural areas. The replacement bridges are valued at over $39.6 million.

“Design-build bridge bundles are an innovative and cost efficient way to repair and replace some of our aging local bridges,” Georgia DOT Commissioner Russell R. McMurry, P.E. said. “The process expedites delivery, minimizes public inconvenience, maximizes industry participation and allows us to get the best overall product for the lowest price.” 

Northeast Georgia claimed nearly $8.1 million in awarded contracts to replace the following five bridges: 

http://accesswdun.com/article/2016/7/428100/gdot-new-contract-bundle-concept-being-used-on-several-northeast-ga-bridge-projects

© Copyright 2015 AccessNorthGa.com All rights reserved. This material may not be published, broadcast, rewritten, or redistributed without permission.