Construction activity for the I-85 widening project in North Georgia will mean a single-lane closure this weekend in Barrow and Jackson counties, according to the Georgia Department of Transportation.
Beginning Friday, March 27, at 7 p.m. through Sunday, March 29, at 7 p.m., crews will maintain a continuous single-lane closure in the northbound, outside lane starting at milepost 127, south of the mainline bridge over Mulberry River, to milepost 128, north of the mainline bridge over Mulberry River in Barrow and Jackson counties.
Drivers are advised to obey posted speed limits and traffic control measures inside the project limits. Additional information about the I-85 Widening project can be found at this link.
http://accesswdun.com/article/2020/3/889909/gdot-i-85-widening-project-means-single-lane-closure-for-the-weekend