The Hall County Landfill will be closed on Saturday, Jun. 1 for essential work on the CSX railroad crossing at Oakbrook Drive.
Hall County officials said the temporary closure is necessary to facilitate the safe and efficient maintenance of the railroad infrastructure.
Additionally, on Thursday, May 30 and Monday, Jun. 10 through Tuesday, Jun. 11 the Gould Lane Compactor Site will be closed for resurfacing.
All Hall County compactor sites will remain open for normal operation while the landfill is closed.
Hall County compactor sites and their locations:
Balus Creek Compactor Site
3845 Old Flowery Branch Road, Oakwood, GA
Blackshear Place Compactor Site
2921 Atlanta Highway, Gainesville, GA
Candler Compactor Site
5064 Poplar Springs Road, Gainesville, GA
East Crescent Drive Compactor Site
738 East Crescent Drive, Gainesville, GA
Flowery Branch Compactor Site
4395 Falcon Parkway, Flowery Branch, GA
Gaines Ferry Compactor Site
6173 Gaines Ferry Road, Flowery Branch, GA
Gould Lane Compactor Site (closed for resurfacing May 30, June 10-11)
1277 Hillside Gardens Lane, Gainesville, GA
Lula Compactor Site
6176 Lula Road, Lula, GA
Murrayville Compactor Site
5117 Thompson Bridge Road, Murrayville, GA
Sardis Road Compactor Site
3166 Brackett Drive, Gainesville, GA
Tadmore Compactor Site
3320 Holly Springs Road, Gainesville, GA
Wauka Mountain Compactor Site
5880 Brookton-Lula Road, Gainesville, GA
http://accesswdun.com/article/2024/5/1245232/hall-county-landfill-to-close-on-june-1-for-railroad-work